So that the bridge crane can be used in the open warehouse

Views: 12     Author: Site Editor     Publish Time: 2020-04-03      Origin: Site

So that the bridge crane can be used in the open warehouse


Generally, it consists of three parts: mechanical, electrical and metal structures. The basic components of the bridge crane and its proper configuration are like a single span flat plate bridge supported on two parallel overhead tracks at both ends, which can be roughly divided into lifting mechanism, trolley operation mechanism and crane operation mechanism.

For the whole lifting process, the lifting mechanism is used to lift the goods vertically; the trolley running mechanism is used to move laterally with the load; and the crane running mechanism is used to move the lifting trolley and the goods vertically to achieve the purpose of carrying and loading and unloading goods in three-dimensional space.

The former metal structure refers to the bridge and trolley frame, while the electrical part includes electrical equipment and circuits. After reasonable configuration of each device, the bridge crane can not only be used for loading and unloading of open warehouse, stock yard, railway freight station, port wharf, etc., but also can be equipped with a variety of special hooks for a variety of special operations.

There are also relevant provisions on the selection. Generally, the lifting capacity is less than 50t, and the span is less than 35m. It is recommended to select single beam without special use requirements. If the width of the leg is required to be large and the working speed is high, or the heavy and long parts are often lifted, the double beam gantry crane is required.

During the working period, sometimes there will be slippage. In order to eliminate this kind of bad phenomenon, we must first analyze the causes of slippage and take corresponding measures according to different reasons. For example, if the bridge crane is selected correctly to match the motor, it should not be too large; at the same time, the load capacity and wheel pressure bearing capacity should be calculated to ensure that the wheel has enough pressure on the wheel rail surface. In addition, it is necessary to control the start-up and braking time of the equipment properly.


Project

CONTACT

Add: Economic Development Area, XinXiang city, Henan province, China.
Phone No: 0086 0373 8506666
Mobile Phone No: 0086 18568525956 
Fax: 0086 0373 8506666
Email: info@dowellcrane.com
Copyright  2016 Dowellcrane Machinery Group. All rights reserved.  Supported by Leadong    sitemap