Article List
- How to ensure the stability of gantry frame?In the supervision and inspection, it is found that the gantry frame used in the construction site has various hidden troubles that affect the stability of the frame, and the main problems are as follows:1. Due to the lack of drainage measures in the foundation of the gantry frame, there is often waDowellcrane News March 30, 2018
- The arm crane uses maintenance rulesCantilever crane dynamics is light, crane is by the post, rotating arm of rotation drive and electric hoist project manufacturing, post firmly in the concrete below the root, the cycloidal pinwheel reducer to drive cantilever hanging back, electric hoist to straight lines on the cantilever beams, anDowellcrane News March 23, 2018
- The top ten common sense of hoisting machine operator!Every year, due to carelessness, mistakes in operation, and lack of common sense in lifting industry, how can we reduce or even avoid tragedy?I have summarized the common knowledge of ten hoisting machine operators:1. Safe positionDuring the lifting operations, under the boom, hanging down, suspendeDowellcrane News March 16, 2018
- Method of assembly of gantry crane door frame1. Before the combination of the door frame, the size and assembly number of all components shall be checked, and the combination surface of each joint web shall be cleaned, and local deformation shall be processed to ensure the combination quality of the door frame.2. The upper and lower beam, theDowellcrane News March 09, 2018
- Technical guidelines for lifting mechanical hooks1. The crane shall not use casting hooks;2. It is strictly forbidden to repair welding with the hook;3. The surface of the hook should be clean, and there should be no crack, sharp Angle, burr and crack;4. The hook shall have an anti-stripping device; The pawl should not be opened when the hook loadDowellcrane News March 03, 2018
- What are the composition of ordinary bridge cranes?Ordinary bridge crane is generally made up of crane trolley, bridge running mechanism and bridge metal structure. Lifting trolley is made up of three parts: lifting mechanism, trolley running mechanism and trolley frame.The lifting mechanism includes motor, brake, reducer, reel and pulley block. TheDowellcrane News February 24, 2018
- Scrapping standard and maintenance of crane pulley blockThe pulley block is a simple machine assembled by several movable pulley and fixed pulley, which can save energy or change the direction of force. The labor force of the pulley block is determined by the number of the rope, and its mechanical efficiency is determined by the gravity of the object beiDowellcrane News February 09, 2018
- Technical operation procedure of gantry crane1. After passing the examination and holding the equipment operator, the operator shall operate. The operator must strictly abide by the relevant safety and succession system.2. Before work, the oil should be filled in strict accordance with the lubrication regulations, and the oil content should beDowellcrane News February 02, 2018
- How to control the shaking in the electric hoist?It is impossible to shake without shaking in an electric hoist. The speed, the weight, the height will shake.It is recommended that users start with the following aspects to minimize the shakingDowellcrane News January 26, 2018
- Safe operating procedures for wall slewing crane (jib crane)The wall jib crane (wall hanging) consists of bracket, spiral arm device, rotary device and electric hoist (chain electric hoist). The bracket is fixed on the wall or steel structure column, can be turned according to the user demand, the rotary part can be divided into manual and electric rotary.Dowellcrane News January 22, 2018