FEM/ISO work level of crane choice

Publish Time: 2018-04-28     Origin: Site

Load state  instructions                                                                                             The average working hours every day (h)

≤0.5 ≤1 ≤2 ≤4 ≤8 ≤16
Q1 Few lifting load rating, often lifting lighter load

1Bm/M3 1Am/M4 2m/M5 3m/M6
Q2 Few lifting load rating, often lifting medium load
1Bm/M3 1Am/M4 2m/M5 3m/M6 4m/M7
Q3 sometimes lifting load rating, more lifting heavy loads 1Bm/M3 1Am/M4 2m/M5 3m/M6 4m/M7 5m/M8
Q4 Often the lifting load rating 1Am/M4 2m/M5 3m/M6 4m/M7 5m/M8 5m/M8


Product Inquiry

Simple gantry cranes used in what problem should note?

What are the operation method of Europe type monorail hoist?

What should to do When the crane body fractures?

The characteristics of Single girder bridge crane

The use of hoisting machinery requirements